A jointly scoped pilot with agreed systems, examples and acceptance criteria.
Compare the OCPP version and supported functions on both sides
Connect status, meter values and transaction references in a test environment
Test disconnection, reconnection and delayed events
Scope, project price, schedule and required provider services are agreed before commissioning. Handover includes the agreed technical documentation and introduction.
Monitor the agreed backend connection and message backlogs; review firmware and protocol changes.
Technical takeover of the agreed existing solution
Agreed monitoring, troubleshooting and change maintenance
Documented handover of open issues and completed changes
Monthly price, allowance, service hours, term and cancellation are agreed separately. Infrastructure, licences and on-call support are included only when explicitly offered.
Required functions and a usable simulator or authorised test charge point
A description is enough for your first enquiry. We will then agree suitable ways to exchange files and arrange access.
What the scope covers
Technical software integration. Electrical installation, assessment under metrology law, billing and OCA certification are excluded. Production control commands and load management are implemented only within a separately agreed scope.
We check the package against your project. Your enquiry is non-binding; commissioning and scheduling are agreed afterwards.
UNDERSTAND THE TOPIC
OCPP connected, data missing: test the complete charging session.
OCPP connects charge points to a management system. The Open Charge Alliance describes different versions and testing options. Saying a device is OCPP capable does not establish which functions its specific firmware supports.